boq for civil works to cement crusherunit

boq for civil works to cement crusherunit

Billing of Quantities (BOQ) | Types | Example BOQ  · An example for BOQ for Reinforced concrete construction (Source: YouTube/civil land) Advantages of Billing of Quantities Anticipation of Difficulties amp; Example of Bill of Quantity fo

Get a quote
Recommended Products

Recommended Products

GZG series of vibrating feeder

GZG Suspended vibrating feeder machine series is widely used ...

Mobile jaw crusher (Crawler type)

The European jaw crusher developed by our company mobile jaw ...

XSD type sand washer series

XSD series impeller sand washing machine is a kind of bucket-...

DC High efficiency European style Jaw Crusher

European version of jaw crusher is also called PEW jaw crushe...

Mobile screening station (crawler type)

Due to its optimized unique dynamic design and intelligent pr...

YK vibrating screen

YK series circular vibrating screen, also known as YK series ...

DVSI High Efficiency Vertical Shaft Impact Crusher

DVSI sand making machine is also a vertical shaft impact sand...

PEW European version jaw crusher

The PEW European version jaw crusher, developed and produced ...

Contact us

Contact us

Billing of Quantities (BOQ) | Types | Example BOQ

Billing of Quantities (BOQ) | Types | Example BOQ

 · An example for BOQ for Reinforced concrete construction (Source: YouTube/civil land) Advantages of Billing of Quantities Anticipation of Difficulties & Challenges. As we write down the brief description of each work to be completed in a particular project, we can simultaneously assess the issues and obstacles tagging along with it.

BOQ -CIVIL WORKS

BOQ -CIVIL WORKS

BOQ -CIVIL WORKS MAIN COMPLEX, De~cription of Work EARTHWORKS . mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of entering, shuttering and finishing, including cost of curing,admixtures in …

BILL OF QUANTITIES FOR ROAD WORKS

BILL OF QUANTITIES FOR ROAD WORKS

 · 5 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All works upto Plinth Level 5a 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size 134 cum 5b 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)-Coping Work 87 cum

Bill of Quantities BOQ | Bill of Quantity for Construction

Bill of Quantities BOQ | Bill of Quantity for Construction

Selling works with supplying of materials: m 3: 1.20: One thousand four hundred forty six and twelve paisa only: 1735.34: 4: Plain Cement Concrete 1:3:6 work with all complete materials: m 3: 0.96: Ten thousand four hundred thirty eight and ninety five paisa: 10021.39

boq for civil works to cement grindingunit

boq for civil works to cement grindingunit

boq for civil works to cement grindingunit SKD Brand Hammer Crusher hammer crusher kap t jaw stone crusher sayaji detalies concrete grinder is available in sri lanka Crusher Direct Sales Point crusher gyratory bhp billiton chile hollow block making machine manufacturing from stone machine Stone Crushing Industry In Malaysia.

What is BOQ & Example of Bill of Quantity for Construction

What is BOQ & Example of Bill of Quantity for Construction

As we know planning of project is most important task in that BOQ plays very crucial role in the planning of a project. In bill of quantity item of work with their quantities are listed, thus half of the work of the planner is already done. Project planner only have to arrange resource and set duration of work completion, planning is done. 5.

BOQ Civil work

BOQ Civil work

work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, 5 shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting . BOQ Civil work .

TENDER BOQ FOR PROPOSED CIVIL WORK FOR STATE

TENDER BOQ FOR PROPOSED CIVIL WORK FOR STATE

Total of Civil Works Providing and laying in position reinforced cement concrete design mix M20 with OPC cement @320kgs, with 20mm and down size graded granite metal coarse aggregegates @0.69cum and fine aggregates @0.46cum, with superplastisiser @3Its confirmign to IS9103-1999 Reaffirmed-2008, machine mixed, concrete laid in layers

BILL OF QUANTITIES civil and specialist's works for

BILL OF QUANTITIES civil and specialist's works for

active zone of 3m. Once all reinforced-concrete works are completed, the next grid shall be excavated. Digging is done by hand and by machine, if possible, including soil removal outside of the building and its returning and compacting upon completion of all works in this area. The depth of excavation is on average 4.0-3.0 m. Excavation shall be

BILL OF QUANTITIES FOR PROPOSED BUILDING & CIVIL

BILL OF QUANTITIES FOR PROPOSED BUILDING & CIVIL

CIVIL WORKS AT LITEN 33/11 KV SUBSTATION ITEM NO. DESCRIPTION UNIT QTY UNIT RATE AMOUNT 1 Preliminaries A Allow for a temporary site office adequate to accomondate six persons,notice board, shelves and , store for materials and tools storage. ITEM 1 B Allow for clean water for the works …

BILL OF QUANTITIES FOR ROAD WORKS

BILL OF QUANTITIES FOR ROAD WORKS

 · 5 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All works upto Plinth Level 5a 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size 134 cum 5b 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)-Coping Work 87 cum

BILL OF QUANTITIES civil and specialist's works for

BILL OF QUANTITIES civil and specialist's works for

active zone of 3m. Once all reinforced-concrete works are completed, the next grid shall be excavated. Digging is done by hand and by machine, if possible, including soil removal outside of the building and its returning and compacting upon completion of all works in this area. The depth of excavation is on average 4.0-3.0 m. Excavation shall be

What is BOQ & Example of Bill of Quantity for Construction

What is BOQ & Example of Bill of Quantity for Construction

As we know planning of project is most important task in that BOQ plays very crucial role in the planning of a project. In bill of quantity item of work with their quantities are listed, thus half of the work of the planner is already done. Project planner only have to arrange resource and set duration of work completion, planning is done. 5.

BOQ Civil work

BOQ Civil work

work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, 5 shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting . BOQ Civil work .

boq for civil works to cement grindingunit

boq for civil works to cement grindingunit

boq for civil works to cement grindingunit HFC Refrigerants (55) HST Hydraulic Cone CrusherHST series hydraulic cone crusher is combined with technology such as machinery, hydraulic pressure, electricity, automation, intelligent control, etc. , representing the most advanced crusher technology in …

Unit Measurement of Various Item Work In Civil

Unit Measurement of Various Item Work In Civil

 · 8-Inch Brick work: It is measured in CUM or m3. * There should be no deductions for small openings like pipe holes for scaffolding and openings less than 0.1 Sqm. 4- Stonework: Stonework is measured in CUM or m3. * There should be no deductions for small openings like pipe holes for scaffolding and openings less than 0.1 Sqm. 5- Concrete work:

Name of work :CIVIL WORK (PART-B) for Construction

Name of work :CIVIL WORK (PART-B) for Construction

Name of work :CIVIL WORK (PART-B) for Construction of Hangars & Utility Buildings & allied facilities-Package-II at HAL, Nasik C. CONTROLLED CONCRETE - PLAIN & REINFORCED 6 Laying in position Reinforced cement concrete machine batched, machine mixed and machine vibrated design mix cement concrete of below specified grade

BOQDETAILS OF FINAL QUOTE FOR RENOVATION OF

BOQDETAILS OF FINAL QUOTE FOR RENOVATION OF

 · 2.00 CIVIL WORK 2.01 Brickwork in 230 mm thick wall extension as/design in cement mortar 1:4 (1 cement and 4 stone dust). 6.58 cum 2.02 Brickwork in 115 mm thick wall extension as/design in cement mortar 1:4 (1 cement and 4 stone dust). 24.00 sqm Cement Plaster ‐P/L internal 10 mm - 25 mm thick cement plaster on walls

Home-Department of Contracts

Home-Department of Contracts

Utility Services BOQ Summary crs Construct block masonry untrapped storm water gulley as per ADT standard drawing RCD 500/15. Rate to include excavation, support, backfilling and disposal, concrete base, concrete block work chamber, concrete cover slab, benching, complete with connection to main pipe and smooth finish to internal walls.

Bill of Quantities and Cost Estimates

Bill of Quantities and Cost Estimates

7166P02/BoQ and Cost Estimates 9-5 Since the Project Sponsor is a cement manufacturer, cost of at least one alternative supplier has been inquired from the list of potential suppliers. Information such as distance of each factory from project site, capacity of production and type of cement produced has been taken into account in the assessment.

Download Excel Sheet For Civil Work Quantities

Download Excel Sheet For Civil Work Quantities

Welcome back in World’s No.1 Civil Engineering Blog Expertcivil.com so finally today I’m going to share for “Download Excel Sheet for Civil Work Quantities” Let’s go and Download the spreadsheet or Excel File.. Why Excel sheet for Civil Work Quantities?

Civil Construction Work Civil Construction Work As Tender

Civil Construction Work Civil Construction Work As Tender

UPRNNL Civil Construction Work Civil Construction Work As Per Uploaded Boq Making Plinth Protection 50Mm Thick Of Cement Concrete 1 , Due Date: 15-10-2020 ,Tender Value: 3597686 ,City : 500 beded super speacility hospital block saifai, Location: Uttar Pradesh Tender Notice 25672470

Annual Repair And Maintenance Of Civil Works For T Tender

Annual Repair And Maintenance Of Civil Works For T Tender

Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm including .

BILL OF QUANTITIES (a) Civil work.

BILL OF QUANTITIES (a) Civil work.

(a) Civil work. S.No. Item/Description Unit Quantity Rate Amount Earth work in excavation by mechanical means (hydraulic excavator)/ manual means in foundation trenches or drains including dressing of sides and ramming of bottoms, lift up to 3.5m including getting out the excavated soil and disposal of surplus excavated soil as directed